Main lubrication point of Kaiping machine

Wuxi Puxin Machinery Factory | Updated: May 24, 2017

I believe that everyone has a certain understanding of Kaiping machine, in use at the same time its lubrication work is very important, today to share with you about the lubrication point of some relevant knowledge, I hope to help you.
1. The guide rod and The Wire rod of the rear stopper. Lubricate once a week.
2. Left and right rails. The initial phase of the input must be lubricated once a day.
3. Synchronous axis, synchronous fork, worm gear. For exposed easily worn parts, even if the lubrication point is not set, it should be lubricated two times per week.
4. For lubrication systems, regular inspection, maintenance and cleaning are required.

Products
Slitting series
Leveling series
Flat steel series
Coil upender
Contact Us
Tel: +86-510-83208381
Mob: +86-13951579100
Add: 76# Qianluo Load, Huishan District,
Wuxi, Jiangsu, China
Email: wxpx0510@163.com
Feedback